Latest visit

## 01 October 2026 The first walls and columns, a second tower crane

16 photos

- [Aerial view from across the boulevard: the site with two tower cranes and the first walls and columns, between office and apartment buildings.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-01)
- [The site seen at an angle from the boulevard corner: the concrete slab with column reinforcement, the cranes and the earth ramp.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-02)
- [Straight-down view: the tower crane, stored steel bars, the access ramp and the slab with the column reinforcement, with the site set-up by the street.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-03)
- [The site entrance seen straight down from above the boulevard: the site parking, the containers and the steel bars stored behind the orange mesh.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-04)
- [Workers on the concrete slab among the column reinforcement and the formwork of the first walls, with the mobile crane behind.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-05)
- [Reinforcement mesh laid over another part of the excavation, with workers, the red-and-blue tower crane and the slope covered with a grey layer on the left.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-06)
- [Steel bars stacked on sheeting beside the site containers, with a backhoe loader and workers in high-visibility vests.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-07)
- [High aerial view with both tower cranes, the slab with the column reinforcement and the reinforced area, between office and apartment buildings.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-08)
- [The concrete slab with the column and wall reinforcement, workers, timber and stacked steel bars, with the mobile crane on the right.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-09)
- [Straight-down view of the slab with reinforcement, the steel bars and the reinforced area, with the tower crane's jib above.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-10)
- [Wide aerial view from across the boulevard, with the site between office buildings, apartment buildings and houses.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-11)
- [Straight-down view of the tower crane above the reinforced area and the slab, with the neighbouring car park on the left.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-12)
- [The mobile crane's boom over the steel bars, with the reinforced area on the left and the slab with walls and columns in progress on the right.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-13)
- [The concrete slab with the column reinforcement and the wall formwork, workers and materials, with the tower crane on the right.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-14)
- [Aerial view from the neighbouring apartment buildings, with the two tower cranes above the site.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-15)
- [Workers on the reinforcement mesh, the mobile crane and the red-and-blue tower crane, with the neighbouring apartment buildings behind.](https://baseexpozitiei.ro/en/construction-progress#img-2026-10-01-16)

## 07 September 2026 Reinforcement, a tower crane and the site set-up

12 photos

- [Steel reinforcement mesh laid over a large area at the bottom of the excavation, with workers, stacked steel bars and a mobile crane on the left.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-01)
- [The reinforcement seen from above, with workers on the mesh, timber formwork along the edge and the red boom of the mobile crane on the right.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-02)
- [The excavation seen straight from above: the reinforced area, steel bars on the concrete surface, the mobile crane and the slopes covered with sheeting towards the neighbouring building.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-03)
- [Aerial view of the site with the tower crane up, the reinforced area and mounds of soil, between apartment and office buildings.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-04)
- [The site seen from above the boulevard: the blue and yellow tower crane, the reinforced area, mounds of soil and machines, with office buildings on either side.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-05)
- [The site seen from above on the opposite side, over the roofs of two office buildings, with the tower crane and the reinforced area.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-06)
- [The site set-up: containers for offices and changing rooms, a backhoe loader and a skip on gravelled ground.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-07)
- [The newly poured concrete pad at the site entrance, with the gate, the fence and the street beside it.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-08)
- [Straight-down view of the site: the tower crane, the reinforced area and steel bars on the concrete surface, with a car park at the bottom.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-09)
- [Workers fitting a wheel-wash unit at the site exit, beside the fence, with a backhoe loader behind.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-10)
- [The site seen from above from the neighbouring apartment buildings, with the slopes covered with sheeting in front and the reinforced area behind.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-11)
- [Oblique aerial view of the whole site, with the tower crane, the reinforced area and the site set-up, between office and apartment buildings.](https://baseexpozitiei.ro/en/construction-progress#img-2026-09-07-12)

## 12 August 2026 The site from a drone

8 photos

- [The site seen from above the street: poplars along the fence, the dug ground with mounds of soil, two machines and a red steel structure, with the neighbouring buildings behind.](https://baseexpozitiei.ro/en/construction-progress#img-2026-08-12-01)
- [High aerial view of the whole plot between office and apartment buildings, with the city behind.](https://baseexpozitiei.ro/en/construction-progress#img-2026-08-12-02)
- [The plot seen at an angle from above, with machine tracks and mounds of soil, between an office building and the street on the right.](https://baseexpozitiei.ro/en/construction-progress#img-2026-08-12-03)
- [The site from the street corner: poplars, the red steel structure behind the fence and the dug ground, with an excavator on the right.](https://baseexpozitiei.ro/en/construction-progress#img-2026-08-12-04)
- [Aerial view of the plot from the other side, with the neighbouring apartment buildings on the right and office buildings behind.](https://baseexpozitiei.ro/en/construction-progress#img-2026-08-12-05)
- [The plot seen from above, between apartment and office buildings, with machine tracks and an earth ramp.](https://baseexpozitiei.ro/en/construction-progress#img-2026-08-12-06)
- [The dug slope of the excavation with track marks, and the neighbouring apartment buildings above.](https://baseexpozitiei.ro/en/construction-progress#img-2026-08-12-07)
- [The site from above the street, with mounds of soil, the red steel structure and the poplars by the fence.](https://baseexpozitiei.ro/en/construction-progress#img-2026-08-12-08)

## 18 June 2026 Earthworks and drilling

5 photos

- [An excavator loads a dump truck in the site excavation; behind, a slope covered with sheeting, the site fence and the neighbouring buildings.](https://baseexpozitiei.ro/en/construction-progress#img-2026-06-18-01)
- [Workers beside a drilling rig in the excavation while a dump truck unloads soil on the ramp behind.](https://baseexpozitiei.ro/en/construction-progress#img-2026-06-18-02)
- [Wide view of the excavation: the drilling rig, workers and a dump truck on the ramp, with the site fence and the neighbouring buildings behind.](https://baseexpozitiei.ro/en/construction-progress#img-2026-06-18-03)
- [The excavator and the dump truck at the edge of the excavation, beside the slope covered with sheeting.](https://baseexpozitiei.ro/en/construction-progress#img-2026-06-18-04)
- [Freshly dug soil in the excavation, with the excavator on the left and the neighbouring apartment buildings behind, above the slope covered with sheeting.](https://baseexpozitiei.ro/en/construction-progress#img-2026-06-18-05)

---

## Contact

- Phone: [+40 21 555 34 15](tel:+40215553415)
- Email: [sales@baseexpozitiei.ro](mailto:sales@baseexpozitiei.ro)
- [Contact page](https://baseexpozitiei.ro/en/contact)

---

Real estate marketing & consultancy by [ADACITY](https://adacity.ro) (marketing & branding agency for real estate developments)